CORPORATE & INSTITUTIONAL PROJECTS

ThermoFisher Scientific

For the interior fit-up of this 100,00 square foot corporate headquarters Elite provided metal framing, drywall and acoustical ceilings.

Location: Waltham, Massachusetts

General Contractor: GEIS

Completion Date: Summer 2016

Fusion Academy

For two locations of the private school Fusion Academy, Elite provided metal framing, drywall and acoustical ceilings, as well as installation of door and hardware.

Two Locations: Burlington, MA and Newton, MA

General Contractor: Quest Construction

Completion Date: Summer 2018

Massachusetts Institute of Technology

Elite has provided metal framing, drywall and acoustical ceiling packages for multiple lab and office renovations throught the MIT Campus.

Location: MIT Campus - Cambridge, MA

General Contractor: Renovations, Inc.

Completion Date: 2015 to present

Serenity at Summit

For this new Medical Detox center in Haverhill, Elite provided all exterior and interior framing, as well as all of the interior sheathing, FPR and acoustical ceilings.

Location: Haverhill, Massachusetts

General Contractor: Pimentel Construction

Completion Date: Summer 2015

RTH Community Center

This ground-up project in Roxbury, MA consisted a gymnasium, office and classroom space, locker rooms and exercise facilities.  Elite provided extensive engineered framing for exterior walls, elaborate curved GWB soffit work inside, as well as typical interior partitions, ceilings and soffits throughout.  Project was completed in 2014.

Location: Boston, Massachusetts

General Contractor: NEI General Contracting

Chelsea Engine Company 3

This project consisted of the renovation and addition to a fire house in Chelsea, MA.  Elite provided framing and drywall throughout the renovation and framed the entire structure of the addition with engineered light gage steel.

Location: Chelsea, Massachusetts

General Contractor: Dagle Electrical Construction Corp.

Completion Date: Summer 2013

Education First - Boston

This project consisted of the renovation of an existing lower floor area into a new kitchen/dining area for EF School in Boston. Elite provided all new interior framing, gypsum board and FRP.  

Location: Boston, Massachusetts

General Contractor: Pimentel Construction

Completion Date: Summer 2015

In addition to the projects featured above, some of our other corporate and institutional projects include:

  • Harvard University

  • Boston College

  • Becker College

  • National Heritage Museum

  • The Goddard School

  • Melmark New England

  • Catholic Charities

  • Seven Hills Foundation

  • Summit Behavioral Health

  • MCLE New England

  • International Lanquage School

  • Dorchester Collegiate Academy

  • North Atlantic Surgical Suites

  • YWCA

  • Genesis Healthcare

  • Altec

  • Tecomet

  • Halloran